Reduced redundancy for some systems in Melbourne due to potential DC power supply issue. - Engineers investigating
DC engineers have reset circuit breaker full power redundancy restored.
Engineers have identified a failed circuit at the DC. DC staff are on route to restore breakers.
ETR 6.30 pm for full redundancy.
engineers on site investigating.
engineers on route. ETA 4:30 local